Pahlisch Homes
My Work 9.02.2026 Minutes Post → Previous minutes →

Minutes · 9.02.2026

1 on 1 with Shelby

Not Fathom-recorded · my notes

Carried from 8.20

The four items we closed the last meeting on, and where each one actually stands.

Status as of this morning

  1. Virtual staging Not done
    Shelby walked me through the good and the meh images we’ve had from Stucco in the past, and is setting up a trial and training run. Not started.
  2. Strength of Place PDF Not done
    Mine to share with Shelby before it goes on to Matt and Brandon. Draft 4 has been ready since the evening of 8.20; I never handed it over. Quail Ridge took the two weeks.
  3. Overland video Still waiting on Sales
    We agreed to wait on Sales. Storyboard has been OK’d by Todd since 8.12 and the site import has been done since 8.14. The approved model list is the only thing in the way.
  4. Structural alternates Open
    Shelby is talking to Jessica about whether we — Torri and team — want more storytelling for the plan alternates.

This meeting

What came out of the 10am.

Source notes

Verbatim from 9.02.2026 1 on 1 with Shelby.texd, as written in Tex before the meeting.

9.02.2026 1 on 1 with Shelby OLD: 1 Virtual Staging: Shelby walked me through the good and the meh images we've gotten from Stucco in the past. She'll set up a trial / training run for me. ***not done 2 I'll share my Strong Places PDF with her before I send it on to Matt and Brandon. ***not done 3 We'll have to wait on Sales to get Overland Video going. 4 Structural alternates: Shelby will chat with Jessica about whether we (Torri, etc..) will want to do more storytelling for the plan alternates.