Ten plans rendered since the 20th. Street view and aerial on each.
8.21
8.21
8.21
8.24
8.24
8.24
8.25
8.25
9.01
9.01
9.01
9.01
8.21 to 9.01
| Plan | Ver | Elev | Garage | Note | Done |
|---|---|---|---|---|---|
| Chase | v2 | F2 | 3c | Shown 8.20 | 8.21 |
| Chase | v2 | P2 | 3c | Shown 8.20 | 8.21 |
| Hillmont | v2 | E2 | 3c | — | 8.21 |
| Hillmont | v2 | F2 | 3c | — | 8.21 |
| Hillmont | v2 | P2 | 3c | — | 8.24 |
| Shasta | v3 | F1 | 3c | Fence fixes | 8.24 |
| Shasta | v3 | T2 | 3c | — | 8.24 |
| Shasta | v3 | C1 | 3c | Stucco | 8.25 |
| Siskiyou | v3 | F1 | 3c | — | 8.25 |
| Siskiyou | v3 | T2 | 3c | Took two days | 9.01 |
| Tahoma | v2 | C1 | 3c | Stucco | 9.01 |
| Tahoma | v2 | F1 | 3c | — | 9.01 |
| Tahoma | v2 | T1 | 3c | In progress | — |
Siskiyou T2 took two days. The AI can't draw our 5″ lap corners and keeps swapping in corner boards. I rewrote the prompt to pin the siding, the site and the camera, which fixed it. Any plan with that siding will run slow, and I can price that in now. Tahoma T1 has the same siding and is on the bench today.
Two tool releases behind the renders above.
Finer alignment grids. Every render above went out through it.
The editor I write these notes in. Tabs, groups, find and replace.
Replaces retyping the same house and site specs every time. This is what carries to the next community.
Draft 4 is ready. It needs your read, then Matt and Brandon.
The argument: buyers can't tell a Pahlisch community from a volume builder's, so they won't pay a premium to live in one. The layout is the reason.
The economic indicators and the NorthWest Crossing assessor study are in. Read the case here.
I said I'd get this to you before it goes up. I didn't. Quail Ridge took the two weeks. Twenty minutes of your time and it moves.
Four of these have been open since 8.20.
Twelve plans are done. I can't say when I'm finished until Sales confirms the list. This is the fastest thing on the page to unblock.
Storyboard signed off 8.12. Site built 8.14. Nothing else is missing.
Read draft 4, then get me in front of Matt and Brandon if you think it holds up.
The trial and training run. Open since 8.20.
Whether Torri and team want more storytelling on the plan alternates.
The site model and prompt document drop onto any community that wants to sell RV parking. If another community needs this, I can turn it around fast. Tell me who to talk to.