Pahlisch Homes
My Work 9.02.2026 · Post Minutes → Previous post →

1 on 1 · 9.02.2026

Since August 20

For Shelby · internal

Quail Ridge RV parking

Ten plans rendered since the 20th. Street view and aerial on each.

Hillmont v2 E2

8.21

Hillmont v2 E2 · aerial

8.21

Hillmont v2 F2

8.21

Hillmont v2 P2

8.24

Shasta v3 F1

8.24

Shasta v3 T2

8.24

Shasta v3 C1 · stucco

8.25

Siskiyou v3 F1

8.25

Siskiyou v3 T2

9.01

Tahoma v2 C1 · stucco

9.01

Tahoma v2 F1

9.01

Siskiyou v3 T2 · aerial

9.01

Production record

8.21 to 9.01

Quail Ridge RV parking · street view and aerial on each
PlanVerElevGarageNoteDone
Chasev2F23cShown 8.208.21
Chasev2P23cShown 8.208.21
Hillmontv2E23c8.21
Hillmontv2F23c8.21
Hillmontv2P23c8.24
Shastav3F13cFence fixes8.24
Shastav3T23c8.24
Shastav3C13cStucco8.25
Siskiyouv3F13c8.25
Siskiyouv3T23cTook two days9.01
Tahomav2C13cStucco9.01
Tahomav2F13c9.01
Tahomav2T13cIn progress

Siskiyou T2 took two days. The AI can't draw our 5″ lap corners and keeps swapping in corner boards. I rewrote the prompt to pin the siding, the site and the camera, which fixed it. Any plan with that siding will run slow, and I can price that in now. Tahoma T1 has the same siding and is on the bench today.

Shipped

Two tool releases behind the renders above.

8.24

Camera X v3.33.0

Finer alignment grids. Every render above went out through it.

8.24

Tex v1.3.0

The editor I write these notes in. Tabs, groups, find and replace.

8.31

One exterior prompt document

Replaces retyping the same house and site specs every time. This is what carries to the next community.

Strength of Place

Draft 4 is ready. It needs your read, then Matt and Brandon.

The argument: buyers can't tell a Pahlisch community from a volume builder's, so they won't pay a premium to live in one. The layout is the reason.

The economic indicators and the NorthWest Crossing assessor study are in. Read the case here.

I said I'd get this to you before it goes up. I didn't. Quail Ridge took the two weeks. Twenty minutes of your time and it moves.

What would help

Four of these have been open since 8.20.

Push on Sales

Quail Ridge final plan list

Twelve plans are done. I can't say when I'm finished until Sales confirms the list. This is the fastest thing on the page to unblock.

Push on Sales

Overland approved models

Storyboard signed off 8.12. Site built 8.14. Nothing else is missing.

Your read

Strength of Place, then an intro

Read draft 4, then get me in front of Matt and Brandon if you think it holds up.

Yours

Virtual staging trial

The trial and training run. Open since 8.20.

You & Jessica

Structural alternates

Whether Torri and team want more storytelling on the plan alternates.

Worth knowing

The RV work is reusable

The site model and prompt document drop onto any community that wants to sell RV parking. If another community needs this, I can turn it around fast. Tell me who to talk to.